Brandywing Springs Elementary School Solar InstallationEXECUTIVE SUMMARY:

  • Feasibility Study –Site Analysis
  • Load Calculations
  • Life Cycle Cost Analysis
  • Site Selection
  • Comprehensive Design, Documentation, Construction
  • Installation
  • Commissioning and System Performance ValidationInverters
  • Grant and Incentives Documentation
  • Monitoring

PROJECT DESCRIPTION:

The Brandywine Springs Elementary School Solar Installation is a 51.48kW grid-tied electric system. Aurora Energy provided a turnkey solution including site analysis, engineering, design and installation for the PPA project.

Solar Installation Ribbon Cutting EventThe system included the installation of 234 roof mounted solar modules across two separate roof surfaces, 7 grid-tied inverters, remote monitoring system and utility interconnection.
The monitoring system is publicly available via the internet and displayed in the school lobby for educational purposes.

PROJECT OWNER:

Helio Sage

COMPLETION DATE:

April 2010

Download PDF